Construction of half flyover at Km.1082+320 (Design Chainage at Km 0+740) at Vijayawada
Airport near Gannavaram on Gundugolanu- Vijayawada section of NH-16 in the State of
Andhra Pradesh on EPC Mode towards rectification of Black Spot ID: AP-(02)-093
@ Rs. 33.98 Cr. |
R&B Telangana @ 43.97 Cr Construction of HLB on Manair river at Khammampally -
Bhoopalapally road in Karimnagar District (Newly formed Peddapally District). |
South Central Railway@ Rs. 24. 86 cr construction of Important bridge on Manair river as
27 x 18.30m (clear span) PSC girders with Well foundation between Potkapalli and
Bisugirsharif stations. |
Construction of Road Over Bridges (ROBs) at 2 Locations LC No. 548 - km 1088/5-7 between
Rewral-Tharsa Stations, LC No. 559 - km 1111/12-14 Near Kanhan Station in Maharashtra
area on Nagpur Division of South East Central Railway." @ 67.26 cr |
Construction of foundation & substructure and Superstructure including assembling,
erection and launching of girders of Major bridges and other associated work in between
Jogidih (Km 110.19) - Obra Dam ( Km 137.89) section - East Central Railway @ 177.98 cr |
Construction of Double Box twin Storey Minor Br. No-26 and other associated works in
Anpara - Shaktinagar Section connection with doubling of Karaila Road - Shaktinagar BG
Rail Line Project under Dhanbad Division of ECR @ 9.88 cr |
Construction of 04 (Four Nos.) ROBs at Ch. 12.100, 33.100, 35.700 and 40.500 in between
Tori - Shivpur and ancillary works in connection with construction of Tori - Shivpur New
B.G. Rail line of ECR @ 63.48 Cr |
RAIL VIKAS NIGAM LIMITED @ 6.60 cr Construction of Railway Officers Rest House &
Railway Tickets Reservation Counter at Governorpet, Vijayawada. |
East Central Railway @ 66.35 cr Construction of New BG Line between TORI-SHIVPUR
Section @ 22.02 lakh cum Earth Work in Embankment, 96,905 cum Excavation in all types
of Soils |
East Central Railway @ 62.34 cr Proposed construction of major bridges at Tori - Shivpur
new B.G. Rail Line of Jharkhand State. |
East Central Railway @ 41.30 cr Proposed construction of major bridges at BRKA-RNC
section new B.G. Rail Line of Jharkhand State. |
South Central Railway @ 48.64 cr Construction of New BG Line between Piduguralla -
Rompicherla Section @ 13.97 lakh cum Earth Work in Embankment, 28,401 cum Excavation
in all types of Soils. |
R&B (NH) Roads @ 56.67 cr Four Lanning with Paved Shoulders from Km 552 to 563. |
NHAI @ 35.00 cr Construction of four lane ROB at Hinganghat, near Nagpur, Maharashtra
@ 374 MT of Composite Steel Girder. |
APCRDA @ 31.48 cr Construction of Fly Over at Vijayawada (E.P.C. Bridge) @ 28.00 m PSC
I Girders 128 Nos |
South Central Railway @ 14.11 cr Construction of Road Over Bridge at Vijayawada @ 35.00
m span PSC Box Girder 2 Nos. |
KSHIP @ 38.00 cr Construction of ROB with approaches at Birur Station, Karnataka @ 329.40
MT of Composite Steel Girder and @ 21,860 sqm RE Wall. |
South Central Railway @ 46.49 cr Construction of New BG Line between Jaggayyapet
Janpuhad Stations @ 13.20 lakh cum Earth Work in Embankment, 3.0 lakh cum Excavation
in all types of Soils. |
South Central Railway @ 37.23 cr Earth work in formation construction of minor bridges at
Gulbarga in Karnataka @ 11.55 Lakh cum Earth Work in Embankment, 2.00 lakh cum Hard
Rock in Excavation. |
Vizag Corporation@ 51 cr Storm Water Drains works at Vizag (E.P.C. basis). |
South Central Railway @ 35 cr Road Over Bridge at Nainavaram, Vijayawada @ 9120 m
Piling Work. |
South Central Railway @ 4.76 Cr Construction of Road Over Bridge with Composite Girder
@ 27.50 m span 2 Nos. |
South Western Railway @ 18.87 cr New BG Railway Line (Kolar to Chikballapur in Karnataka. |
South Central Railway @ 3.94 cr Modernisation of Wagon work shop at Guntupalli. |
Southern Railway @ 23.81 cr Proposed construction of major bridges at Pattukkottai. |
Southern Railway @ 14.16 cr Proposed reconstruction of minor bridges at Karaikkudi. |
Executed @ 55 cr Project 3 Road Over Bridges with Earth work @ 10 Lakh Cum for IRCON
for NHAI Madurai (Tamilnadu) @ 52.00 m long PSC Box Girder for Railway Span, 9,500 sqm
RE wall. |
South Western railway @ 11.06 Cr Maddur Construction of Road Over Bridge @ 4 spans of
38.00 m span PSC I Girders 20 Nos. |
South Western Railway @ 10.27 Cr Mathakeri Construction of Road Over Bridge @ 28.00 m
span PSC I Girders 120 Nos. |
Executed Irrigation works @ 55 cr 11Kms Canal Excavation involving 12 Lakh Hard Rock
Excavation and 14 Lakh all soils Near Kurnool (Andhra Pradesh). |
Executed 1 Fly over @ 22 cr for Jastoll Road Project at NH4 near Bangalore, Karnataka. |
Executed 2 Major River Bridges @ 15 cr on Kavery River for Soma Enterprises in Karnataka
@ 40 .00 m span PSC Box Girder 4 Nos., 33.00 m span PSC I Girder 7 spans 28 Nos. |
Executed @ 8.7 cr Road Overbridge at Chandrapur City for IRCON - MSRDC. |
Executed @ 2.65 cr Road Overbridge at Tadali for IRCON - MSRDC |
Executed 3 Grade Separators with RE walls, Earth works for NHAI @ 14 cr at Tumkur in
Karnataka. |